Trello is a popular project management tool, but it’s not the perfect fit for every team. Whether you’ve outgrown its simple boards, need more robust reporting, or want deeper integrations, there are plenty of Trello alternatives that offer powerful features and flexible workflows to better support your projects.

I’ve tested and reviewed top project management platforms with Trello users in mind—focusing on usability, team collaboration, customization, and value. Whether you're managing agile workflows, client projects, or internal teams, there's a tool here that can take your productivity to the next level.

What is Trello?

Trello is a visual project management tool that helps individuals and teams organize tasks, track progress, and collaborate in real time.

Using a board-based system with lists and cards, Trello makes it easy to plan projects, assign tasks, and monitor workflows. It’s popular among project managers, marketers, and developers for its flexibility, ease of use, and ability to streamline team coordination.

Why Use a Trello Alternative

You might be looking for an alternative to Trello if you:

  1. Need advanced reporting and analytics, such as for detailed project tracking and insights.
  2. Require better integration options.
  3. Need highly customizable workflows and features.
  4. Need consistent access without an internet connection to your project management software.
  5. Require comprehensive security features.

Alternatives to Trello often provide features that address these limitations. They offer advanced reporting tools for in-depth analytics, extensive integration options for a broader range of software, and greater customization to fit unique workflows.

Enhanced offline functionality ensures access to project information without internet, and improved security features provide better protection for sensitive data. These alternatives cater to users seeking more comprehensive solutions that more closely align with their specific project management and collaboration needs.

Best Trello Alternatives Comparison Chart

Here is a table where you can compare all the alternatives we just covered in the overviews.

Best Trello Alternative Reviews

Here are a few of the best Trello alternatives and a description of what makes them special.

Best for customizable features

  • Free plan available
  • From $9/user/month (billed annually)
Visit Website
Rating: 4.6/5

monday.com is a work management platform designed to help teams of any size plan, organize, and execute projects. Its highly customizable features make it adaptable for businesses across various industries, empowering teams to manage workflows, track tasks, and improve collaboration with ease.

Why monday.com is a good Trello alternative: monday.com offers advanced customization options, including templates that can be tailored to your specific workflows. Its project dashboards allow you to track progress visually, while time tracking features enable you to monitor task durations and optimize resource allocation. Overall, the platform's flexibility makes it an excellent choice for teams with unique processes and evolving needs.

monday.com Standout Features & Integrations:

Features include advanced project dashboards for tracking multiple workflows in one view, as well as time tracking features to monitor how long tasks take to complete. Custom automations reduce repetitive work, while drag-and-drop functionality allows for quick task reorganization. Furthermore, monday.com provides detailed activity logs and private boards to help you manage sensitive projects securely.

Integrations include Google Drive, Slack, Microsoft Teams, Dropbox, Zoom, Zapier, Gmail, Outlook, Salesforce, and HubSpot.

Pros and Cons

Pros:

  • Adapts to different team sizes
  • Clear visualizations for progress tracking
  • Flexible templates for various use cases

Cons:

  • Setup takes time for larger teams
  • Limited options for exporting data

New Product Updates from monday.com

monday.com Adds Microsoft Teams Messaging In Workflows
monday.com’s Teams messaging lets workflows notify specific users directly.
March 22 2026
monday.com Adds Microsoft Teams Messaging In Workflows

monday.com introduces Microsoft Teams messaging within workflows. This update allows users to send messages to specific individuals directly from workflows, improving collaboration and communication. For more information, visit monday.com’s official site.

Best free plan for a Trello alternative

  • Free plan + free demo available
  • From $7/user/month (billed annually)
Visit Website
Rating: 4.7/5

ClickUp is a project management software and Kanban tool with powerful features for managing and completing all your team's projects in one platform. Users can plan projects, schedule tasks, and manage resources in a centralized workspace on Kanban boards, as well as calendars, Gantt charts, timelines, and more.

Task management features include task checklists, subtasks, and task templates, as well as the ability to filter, sort, search for, easily reorder, and view tasks in the manner most convenient for the team. Users can also create Gantt charts, calendars, and timelines to visualize tasks.

ClickUp also includes features for creating, sharing, and collaborative editing for Wikis and documents. Users can comment on documents and tasks, assign comments, and chat with other team members for increased communication and collaboration. Reporting features include the ability to create custom dashboards, as well as six built-in report types for team reporting.

ClickUp offers native integrations with Slack, G Suite, Dropbox, and many more tools, as well as over 1,000+ integrations through Zapier.

ClickUp's free plan is robust and includes all primary features. The unlimited plan starts at $5 a month per user and offers additional functionality.

New Product Updates from ClickUp

ClickUp Enhances Task Management and Introduces AI Notetaker
ClickUp lets users update and categorize task types directly within views.
March 1 2026
ClickUp Enhances Task Management and Introduces AI Notetaker

ClickUp introduces an AI Notetaker for meetings and improves task type management in views. These updates help teams capture meeting insights automatically and organize work more efficiently. For more information, visit ClickUp’s official site.

Best for development teams

  • Free plan and 14-day free trial available
  • From $8.50/user/month
Visit Website
Rating: 4.3/5

Shortcut is a project management tool designed for development teams, offering a way to plan, track, and manage work efficiently. Its platform is built around stories, epics, and milestones, giving your team a structured way to break down tasks and manage progress in real-time. 

While both tools let you create boards and cards to track work, Shortcut’s unique focus on development processes gives it an edge. Features like epics, which allow you to manage larger initiatives, and stories, which break down tasks into smaller pieces, are integrated into its workflow.

Another feature that sets Shortcut apart is its iteration tracking. While Trello can be used for basic sprint management through its Kanban boards, Shortcut goes further by offering specific tools for agile teams. You can create sprints, assign tasks, and view detailed reports on how your team is performing over multiple iterations. Shortcut also provides custom workflows that allow you to tailor processes according to your team’s needs.

Shortcut offers various integrations, including Slack, GitHub, GitLab, Figma, Codestream, Bitbucket, Notion, Loom, Dailybot, Plecto, LinearB, Lambda Test, Testlodge, Google Calendar, Sentry, FireHydrant, and Vanta.

New Product Updates from Shortcut

March 22 2026
Shortcut Introduces SLA Alerts for Workflow Tracking

Shortcut introduces SLA Alerts within Stories, currently available in early access. This update enables automatic deadlines and early breach warnings to help teams stay on top of high-priority work. For more information, visit Shortcut’s official site.

Best price for freelancers and small teams

  • Free plan + free demo available + 15-day free trial
  • From $4/user/month (billed annually)
Visit Website
Rating: 4.2/5

Zoho Projects is an online project management tool tailored for teams and freelancers to plan, track, and collaborate on projects effectively. It provides an affordable solution for managing tasks, timelines, and team workflows.

Why Zoho Projects is a good Trello alternative: Zoho Projects includes time tracking features that allow your team to monitor work hours and ensure tasks stay on schedule and within budget. Furthermore, the tool's detailed project status reports give you a clear overview of progress, helping you identify delays and optimize workflows. The tool also provides task dependencies that can help your team handle complex project structures more efficiently.

Zoho Projects Standout Features & Integrations:

Features include milestone tracking, which ensures your team stays aligned with project goals and deadlines. The issue tracking module also allows you to log and address problems, improving project delivery. Additionally, time logging is integrated directly into task workflows to simplify the process of tracking hours worked on specific tasks.

Integrations: Being part of the Zoho's ecosystem allows Projects to connect to several of Zoho's own services such as Zoho Books, Zoho CRM and Zoho's finance suite. The new Zoho marketplace allows 3rd party integrations as well. Integrations via Zapier and Zoho Flow are also supported.

Pros and Cons

Pros:

  • Affordable for freelancers and small teams
  • Integrates well with other Zoho apps and tools
  • Includes Gantt charts for timeline adjustments

Cons:

  • Dashboard customization is limited in certain areas
  • Customizing reports can take extra time

Best for built-in brainstorming & diagramming

  • Free plan available
  • From $8/user/month
Visit Website
Rating: 4.8/5

Miro is an online collaboration platform designed for teams to brainstorm, create diagrams, and manage projects visually. It is ideal for teams across industries that value creativity and dynamic problem-solving.

Why Miro is a good Trello alternative: Miro provides a collaborative whiteboard environment where your team can brainstorm and organize ideas visually. It includes a variety of pre-designed templates for flowcharts, mind maps, and kanban boards to simplify project planning. Furthermore, the tool supports real-time collaboration, allowing your team to contribute and make updates simultaneously. Its focus on visual workflows makes it a standout choice for teams prioritizing creative and interactive project management.

Miro Standout Features & Integrations:

Features include sticky notes for quick idea capture to help brainstorming sessions flow more easily. The diagramming tools allow your team to build detailed visuals, such as flowcharts or process maps, directly within the platform. Moreover, the voting functionality empowers your team to make decisions collaboratively during meetings or workshops.

Integrations include Slack, Google Drive, Jira, Microsoft Teams, Zoom, Asana, Notion, Dropbox, Trello, and Salesforce.

Pros and Cons

Pros:

  • Built-in communication features for streamlined collaboration
  • Intuitive and easy setup
  • Free forever plan available

Cons:

  • Free version does not allow high-quality export to pdf
  • Zooming can be jumpy on larger projects
  • Visitor/guest accounts locked to paid plans only

New Product Updates from Miro

Miro Enhances AI Workflows and Tables for Task Planning
Miro AI generates a Kanban board from document notes for task planning.
March 1 2026
Miro Enhances AI Workflows and Tables for Task Planning

Miro enhances AI workflows and Tables with AI-generated planning boards and web-aware automation. These updates help teams organize tasks faster and analyze external content within workflows. For more information, visit Miro’s official site.

Best for visual project management

  • Free demo + 14-day free trial available
  • From $11/user/month
Visit Website
Rating: 4.8/5

Kanban Tool is a project management platform that helps teams visualize workflows, track progress, and improve productivity. It is ideal for businesses seeking a simple yet effective way to manage tasks and enhance team collaboration.

Why Kanban Tool is a good Trello alternative: Kanban Tool excels in offering intuitive visual boards that simplify task organization and progress tracking. Its time tracking feature helps your team monitor productivity directly from the task board. Additionally, its analytics tools provide actionable insights into team performance and workflow bottlenecks. The platform is also easy to customize, which makes it particularly suitable for teams with unique project requirements.

Kanban Tool Standout Features & Integrations:

Features include a built-in calendar view that provides a clear timeline of tasks and deadlines to help your team plan effectively. The WIP (Work in Progress) limits feature also ensures your team stays focused by preventing task overload on any workflow stage. Additionally, the offline access capability allows your team to update boards even without an internet connection, ensuring work continuity.

Integrations include Slack, Zapier, Dropbox, Google Drive, Microsoft Teams, Jira, GitHub, Trello, Asana, and Salesforce.

Pros and Cons

Pros:

  • Suitable for both small teams and large organizations
  • Supports task automation to reduce manual work
  • Offers swimlanes for detailed task organization

Cons:

  • Less flexibility for detailed project portfolio management
  • Reporting tools require initial setup and configuration

Best combination with a full project management suite

  • 14-day free trial
  • From $29/user/month
Visit Website
Rating: 4.8/5

Breeze is a project management tool that helps teams track tasks, manage workflows, and oversee projects efficiently. It is ideal for organizations looking for a comprehensive platform to handle all aspects of project management.

Why Breeze is a good Trello alternative: Breeze combines task management with features like time tracking and resource allocation to give your team more control over projects. Its visual boards help you organize workflows and ensure transparency across tasks. The platform also includes built-in reporting tools to help your team analyze performance and make informed decisions. Additionally, Breeze supports project timelines and budgeting, which makes it a suitable tool for complex and multi-faceted projects.

Breeze Standout Features & Integrations:

Features include advanced project budgeting tools that let your team plan and monitor financial resources. The workload tracking feature additionally ensures that team members aren't overloaded and resources are balanced. Breeze also offers a centralized file management system to keep all your project documents accessible in one place.

Integrations include Slack, Trello, Google Drive, Dropbox, Microsoft Teams, GitHub, Zapier, Salesforce, Asana, and QuickBooks.

Pros and Cons

Pros:

  • Provides visual project overviews with Kanban boards
  • Enhances collaboration with shared document management
  • Supports recurring tasks for consistent workflows

Cons:

  • Not ideal for teams without budget management needs
  • Limited pre-built templates for quick setup

Best for automation capabilities

  • Free plan available
  • From $13/user/month (billed annually)
Visit Website
Rating: 4.6/5

MeisterTask is a project management tool designed to help teams automate workflows and organize tasks effectively. It caters to teams looking for a streamlined approach to managing projects with minimal manual intervention.

Why MeisterTask is a good Trello alternative: MeisterTask simplifies project management with automation capabilities that reduce repetitive manual tasks. Its fully customizable Kanban boards allow your team to tailor workflows to match specific project requirements. Additionally, its progress tracking widgets provide real-time updates on project status, keeping everyone aligned.

MeisterTask Standout Features & Integrations:

Features include role-based permissions that allow your team to control access to tasks and projects for better security and organization. The agenda view can help users manage personal priorities by consolidating tasks from multiple projects in one place. MeisterTask also provides in-task checklists to break down complex tasks into smaller, actionable steps for improved clarity and execution.

Integrations include Slack, Google Drive, Dropbox, Microsoft Teams, GitHub, Zapier, Salesforce, Asana, Trello, and Outlook.

Pros and Cons

Pros:

  • Simplifies task creation with templates and automations
  • Offers built-in time tracking for monitoring productivity
  • Includes task relationships to manage project dependencies

Cons:

  • Task relationships may be complex for beginners
  • Not ideal for teams using traditional methodologies

Best Kanban board tool with reporting features

  • 30-day free trial + free demo available
  • From $14/user/month (billed annually)
Visit Website
Rating: 4.4/5

Marketing itself as the “Ultimate Kanban Board Tool”, ProjectManager.com delivers just about everything you need in a Kanban board, along with real-time reporting, collaboration, and time and expense management features. If you’re looking only for a Kanban board, this software provides way more than you need. However, if you want a whole project management ecosystem around your Kanban board, ProjectManager.com is a great choice.

ProjectManager.com’s Kanban boards feature the ability to attach files to cards, make comments, assign tasks, assign work-in-progress limits, and get an overview of your progress in the dashboard view.

The reporting feature is above average, letting you pull various types of pre-set reports with just a click or create your own custom reports. The only thing it doesn’t do as well as other tools is to build automated workflows. However, it does provide a really useful viewing feature which can help you visualize your workflow, as you can toggle easily between different task views (Gantt chart, list, board).

ProjectManager.com comes with integrations with GoogleApps (like Drive, Gmail, and Calendar), Microsoft Office and Microsoft Project. For other integrations, you can use Zapier.

ProjectManager.com pricing starts at $15/user/month, with their basic “Personal” plan requiring a minimum of 5 users. They offer a 30-day free trial (a credit card is required).

Best collaborative Kanban tool

  • Free demo available
  • From $2,500/month
Visit Website
Rating: 4.3/5

Kissflow Project is a project management platform that helps teams organize workflows and collaborate on tasks effectively. It is designed for teams looking to track and manage projects with customizable visual tools.

Why Kissflow Project is a good Trello alternative: Kissflow Project features collaborative Kanban boards that allow your team to track tasks, prioritize work, and manage dependencies easily. Its drag-and-drop functionality lets your team make updates quickly and keep workflows moving efficiently. You can also assign tasks, set deadlines, and use visual indicators to monitor progress in real-time. Furthermore, the tool includes advanced collaboration options like shared commenting and automated notifications to keep everyone aligned.

Kissflow Project Standout Features & Integrations:

Features include task dependencies that help your team map out and track complex workflows visually. The platform also offers built-in analytics that provide detailed insights into task completion times and team performance. Additionally, you can create templates for recurring workflows, making it easy to replicate successful processes across multiple projects.

Integrations include Google Workspace, Microsoft Teams, Slack, Dropbox, Salesforce, Zapier, Jira, QuickBooks, Asana, and HubSpot.

Pros and Cons

Pros:

  • Offers real-time progress tracking and collaboration
  • Supports templates for recurring workflows
  • Customizable Kanban boards for flexible workflows

Cons:

  • Limited customization options for unique workflows
  • Setup can be time-consuming for large teams

Other Trello Alternative Tools

Here’s a list of a few more alternatives to Trello that are worth your consideration.

  1. Kanban Zone

    Cross-portfolio Kanban board

  2. Zenhub

    For agile project management within GitHub

  3. Taskworld

    For large variety of features

  4. Planview LeanKit

    For lean project management

  5. Businessmap

    For agile portfolio management

  6. SwiftKanban

    For customized card types

  7. Hygger

    For software development

  8. Height

    For free guest accounts

  9. Clarizen Go

    Fully-featured, flexible PM tool easily configured to support Kanban and agile methodologies

  10. Pneumatic Workflow

    For streamlining digital projects

If you still haven't found what you're looking for here, check out these other related tools that we've tested and evaluated: 

Selection Criteria for Trello Alternatives

When choosing project management software, it’s essential to consider both each tool's key functionalities and how they relate to your specific needs. Through personally researching and trialing these tools, I have developed a set of selection criteria that I use to provide accurate recommendations. Each criterion is weighted to reflect its importance to my overall assessment.

Here is a summary of the selection criteria I used to create this list:

Core Project Management Functionality (25% of total weighting score): To be considered for inclusion on my list of the best Trello alternatives, the solution had to support the ability to fulfill common use cases:

  • Task creation and assignment
  • Project timeline and milestone tracking
  • Team collaboration and communication
  • Progress and performance reporting
  • Resource allocation and management

Differences from Trello (25% of total weighting score): Identifying unique features and functionality not offered by Trello also helps in finding tools that offer added value. This includes:

  • Advanced reporting tools for in-depth analytics
  • Extensive integration options with a broader range of software
  • Greater customization capabilities for unique workflows
  • Robust offline functionality for consistent access
  • Enhanced security features for better data protection

Usability (10% of total weighting score): Usability ensures that the software is easy to navigate and accessible for all users, minimizing the learning curve. As such my evaluation looks for:

  • Intuitive interface design
  • Easy navigation and accessibility
  • Drag-and-drop functionality for task management
  • Customizable dashboards and views
  • Minimal learning curve for new users

Onboarding (10% of total weighting score): Effective onboarding is crucial for quickly realizing the value of the software and ensuring user adoption. This criterion assesses:

  • Availability of training videos and tutorials
  • Pre-built templates for quick setup
  • Interactive product tours and onboarding guides
  • Access to chatbots and customer support during onboarding
  • Webinars and workshops for deeper understanding

Customer Support (10% of total weighting score): Reliable customer support ensures users can resolve issues promptly and maintain productivity. This criterion focuses on:

  • 24/7 customer support availability
  • Multiple support channels (chat, email, phone)
  • Comprehensive help center and documentation
  • Fast response times for support queries
  • Quality of support interactions and resolutions

Value For Money (10% of total weighting score): Value for money assesses whether the software provides a good return on investment relative to its cost. This includes:

  • Competitive pricing plans
  • Transparent pricing without hidden fees
  • Flexible subscription options
  • Features offered at each pricing tier
  • Return on investment based on feature set and performance

Customer Reviews (10% of total weighting score): Customer reviews provide insights into real user experiences and satisfaction. This criterion evaluates:

  • Overall satisfaction ratings from users
  • Feedback on usability and functionality
  • Reviews on customer support experiences
  • Insights on software reliability and performance
  • Testimonials on the impact on productivity and efficiency

Trello Key Features

Here are some key features of Trello that your alternative software should be able to replicate or improve upon in order to be a good fit:

  1. Boards: Trello’s visual boards provide a clear overview of different projects and help keep tasks organized within specific contexts.
  2. Lists: Lists within boards allow users to categorize tasks into stages or types, making it easier to manage workflows and see what needs attention.
  3. Cards: Each task is represented by a card, which can be moved between lists to show progress, helping to visually track the status of each task.
  4. Labels: Labels add color-coded tags to cards, allowing users to quickly identify task categories, priorities, or departments involved.
  5. Checklists: Checklists within cards break down tasks into smaller steps, ensuring that users don’t miss any details and can track subtasks easily.
  6. Due Dates: Setting due dates on cards helps users keep track of deadlines and ensures timely completion of tasks.
  7. Attachments: Adding attachments to cards keeps all relevant documents and files in one place, facilitating easy access and collaboration among team members.
  8. Comments: The comment feature on cards allows team members to communicate directly about specific tasks, improving collaboration and keeping all discussions in context.
  9. Integrations: Trello integrates with various tools like Slack, Google Drive, and more, enhancing functionality and streamlining workflow by connecting with other software I use.
  10. Power-Ups: These add-ons extend Trello’s capabilities, offering additional features like calendar views, automation, and custom fields to tailor the tool to your specific needs.

Trello FAQ

Here are some common questions about Trello that we thought we would answer.

What is Trello used for?

Here are 10 things Trello is used for:

  1. Project management
  2. Workflow management and workflow automation
  3. Event planning
  4. Personal task management
  5. Time Tracking
  6. Website and blog management
  7. Files or digital collection organizing
  8. Hiring and employee onboarding
  9. File storing and sharing
  10. Product planning and roadmapping

Is Trello a Windows app?

Trello works on all web and mobile devices, and they offer mobile apps for Android and iOS as well as desktop apps for macOS and Windows.

Is Trello open source?

No. Trello is a closed source SaaS. Open source alternatives that are similar to Trello include Taiga, Kanboard, Wekan, TaskBoard, and Restyaboard.

What is Kanban?

Kanban is a project management and workflow method based on a work management system developed in Toyota manufacturing plants in the 1960s. The Kanban method allows you to minimize multitasking, streamline your work in progress efficiency, and improve the speed and quality of the work your collaborative and self-managing teams produce.

Is Trello based on Kanban?

Trello collaboration software is based on the Kanban method, using Kanban boards, cards, and swimlane structures that are characteristic of the Kanban method.

What if I want alternatives to other tools?

If you want to find alternatives for any of your other tools, you can check out some of our other alternatives lists:

trello alternative logos list

What's Next?

If you're in the process of researching Trello alternatives, connect with a SoftwareSelect advisor for free recommendations.

You fill out a form and have a quick chat where they get into the specifics of your needs. Then you'll get a shortlist of software to review. They'll even support you through the entire buying process, including price negotiations.

Ben Aston
By Ben Aston

I’m Ben Aston, a digital project manager and founder of thedpm.com. I've been in the industry for more than 20 years working in the UK at London’s top digital agencies including Dare, Wunderman, Lowe and DDB. I’ve delivered everything from film to CMS', games to advertising and eCRM to eCommerce sites. I’ve been fortunate enough to work across a wide range of great clients; automotive brands including Land Rover, Volkswagen and Honda; Utility brands including BT, British Gas and Exxon, FMCG brands such as Unilever, and consumer electronics brands including Sony. I'm a Certified Scrum Master, PRINCE2 Practitioner and productivity nut!