Skip to main content

If you’re evaluating project management software, you’re bound to come across “Integrates with Google Workspace” (Gmail, Calendar, Docs, and more) somewhere on the marketing site of nearly every tool available on the market. This is the one integration that’s table stakes for the category, and it’s also one of the least informative lines on a feature comparison table, because it covers an enormous range. At one end, it describes a live, two-way relationship with your team’s email, calendar, and files. At the other end, it describes a button that copies a link.

Here’s the version of that gap most teams will recognize: you attach a Google Doc to a task and assign it to a colleague. They open the task, click through to the document, and land on the request-access screen. Now there’s an email, maybe a message in Slack, an approval to click, and a few minutes gone from both of your days. The integration worked exactly the way it was designed to work; it just didn’t do the thing you needed it to do.

Every point of friction like that one carries a cost, and the cost is easy to underestimate because each individual instance is so small. Nobody notices four minutes. What teams notice eventually is that a meaningful part of the week goes to re-entering information that already exists somewhere else, reconciling two systems that disagree about the same date, and reorienting after every switch between the tool where work is tracked and the tools where work actually gets done.

So it’s worth holding every integration on your shortlist to one standard: you should shop for the system where nothing has to be maintained by hand. The article below will walk you through how to test for that.

Connecting your project management tool to Google Calendar: does the calendar reflect your source of truth?

Start here, because this is the difference you can verify fastest and the one most likely to touch your team every single day.

The test takes about ninety seconds. When you’re piloting the tool, sync a task to your calendar. Drag it to the next day. Now go look at that task inside your project management tool. Did the date change?

For a lot of tools in this category, it didn’t, and it won’t. What they offer is a one-way feed: the tool publishes to your calendar, and the calendar has no way to answer back. Some are subscribed feeds that refresh on their own schedule, which means the version you’re looking at can be hours or a full day behind. You can see work on your calendar, but you can’t manage it there. So when a meeting lands on top of a task work block, you can’t easily move it, and the two systems drift apart until you go back and correct the tool by hand — extra work on top of your real work.

GQueues offers two-way syncing with Google Calendar, in real time

GQueues is a task and project management tool that syncs with Google Calendar in both directions, immediately. Drag a task to a new day or time on your calendar and the task reschedules itself in GQueues. Change the date in GQueues and the calendar reflects it right away. There’s no refresh interval to wait out and nothing to reconcile afterward, because there’s only one set of dates and both apps are reading from it.

GQueues blocks time for real work

A reminder tells you something is due, but a block of time tells you when you’re going to do it. Tools that place tasks as all-day items at the top of your calendar are giving you the first one — a row of due dates hovering above a day that’s already fully booked with meetings, which is how you end up with too much on your plate and broken promises to whoever assigned you the task. Tasks that occupy real time on the grid give you the second: they compete for your hours honestly, the way a meeting does, and you plan around them accordingly.

Multiple projects deserve multiple calendars

Syncing every task your team owns onto one calendar produces a wall of color that’s hard to read and easy to start ignoring. In GQueues, each project can sync to its own Google Calendar, so you can toggle a project’s work on and off your view the same way you’d hide a coworker’s calendar until you need to check their availability. When you’re heads-down on one launch, you can look at the launch. When you’re planning the month, you can turn everything on at once.

Creating tasks from Gmail

For many teams, the work you’re asked to do arrives as email. A client sends a change request, a colleague asks for a review, a vendor confirms a date that falls like a domino into three other things. If capturing these tasks means switching tabs, finding the right project, retyping a summary of the message you just read, and pasting a link back to it, that’s a real deterrent to getting anything done. If your project management tool doesn’t integrate deeply with your Gmail inbox, what people do instead is leave the message in the inbox as its own reminder — flag it, star it, mark it unread — which is the exact behavior the project management tool was brought in to replace.

A Workspace add-on, not a browser extension

These two get described the same way on a feature table, and they aren’t the same thing. A Google Workspace add-on runs inside Gmail itself. It’s part of the interface, it works in whatever browser someone prefers, and it works in the Gmail mobile app. A browser extension is a separate piece of software running in one browser on one desktop computer. If part of your team uses Safari or Firefox, or if anyone triages email from their phone (nearly everyone does), an extension only covers a fraction of the moments when work arrives.

What GQueues lets you do from an open message

The GQueues add-on runs in Gmail on desktop and mobile. From a message you’re already reading, you can create a task, search the tasks you already have, edit one, and check something off without leaving your inbox. You can link the email to a task as a live reference, so the thread stays one click away as it continues, or you can attach the contents of the message when a colleague needs to read it.

Sending tasks to a list by email

Any list in GQueues will also accept tasks sent to it by forwarding an email, from any account — including the personal one you happen to be signed into on your phone. It’s the low-friction path for the request that arrives while you’re standing in an airport, and it means nobody has to be logged into anything to get something on the list.

GQueues handles Google Drive permissions for file access serendipity

Back to the request-access screen from the intro to this article: the universal experience that has frustrated all of us at one point or another.

When most tools attach a document to a task, what they’re storing is a link. The tool knows the URL, and that’s the beginning and end of the relationship. It has no connection to the sharing settings on the other end of that link, which live in Google Drive and are managed separately. So whoever could open the file before can open it now, and whoever couldn’t, still can’t — including the person you just handed the work to. It’s a small failure that happens constantly, which is what makes it expensive, and it always surfaces at the worst possible moment, because it surfaces when someone is about to begin to do the work.

Permissions follow the role intelligently with GQueues

When you attach a Drive file to a task in GQueues, access to that file is granted automatically based on the role that person already holds in that team. Permissions are intuitive: someone who’s there to watch the work gets view access, someone who’s there to do the work gets edit access. Nobody has to request anything, and nobody has to remember to grant it, which matters more than it sounds like it should — the reason access requests pile up isn’t that people are unwilling to approve them, it’s that approving them requires interrupting whatever you were doing.

GQueues lets you create the document from the task

The same idea works from the other direction. Rather than making a document first and attaching it second, you can create a new Google Doc, Sheet, or Slide deck directly from a task in GQueues. It attaches itself, and all the right people already have access, because it inherits the permissions of the team it was created in. This one is worth checking against your shortlist specifically: a number of tools in this category can only link to files that already exist, which means the document still has to be created somewhere else and shared by hand before it’s useful to anyone but you.

GQueues connects folders, not just files

Some work references a body of material rather than a single document — a client folder, a season’s worth of assets, a shared research directory. GQueues lets you attach the folder itself, so the task points at the whole thing and stays correct as the contents change, rather than pointing at four files that were the right four files last quarter.

The parts nobody demos

None of the following will decide your evaluation on its own, but together, they’re most of the difference between a tool your team actually uses and a burden that becomes the most frustrating part of everyone’s day.

  • Signing in with Google, so there’s no separate password to manage and no new account for anyone to forget
  • Pulling assignees and share recipients from Google Contacts, so you’re choosing from names you already have
  • Installing across your whole domain from the Google Workspace Marketplace, so your admin sets it up once for everyone, rather than walking people through it one at a time
  • Importing from Google Tasks in a single step, completed items included

Why it’s built this way

GQueues has been built for Google Workspace since 2009. It wasn’t designed as a general-purpose project manager that later added Google to a list of fifty available connectors — we were built to work deeply with Google Workspace from the first day, which is why the calendar sync runs both ways, why attachments understand who ought to be able to open them, and why the interface feels familiar to a Workspace user the first time they open it.

That focus is also why GQueues holds an Editor’s Choice badge in the Google Workspace Marketplace. It’s now part of Baydin, the team behind Boomerang for Gmail, which has also been building on Google’s platforms for more than fifteen years.

Run the test yourself

The fastest way to evaluate any of this is to stop reading about it and try it on whatever tools you’re already considering. Attach a document to a task and assign it to a colleague — see whether they have to ask you for access. Put a task on your calendar and drag it to a different day — see whether the dates for the task are updated.

GQueues is a task and project manager built for teams on Google Workspace, with team plans starting at $4 per user per month. Try it free for 14 days, or install it for your whole domain straight from the Google Workspace Marketplace.